Phone (717)  889-1368      Fax (610) 340-2354

Burnham ES2/Series3/ESC & MPO-IQ Option Card Installation Manuals

 

                                                                                  

                                             Low water cut-off                External Limit                      Outdoor Reset

                                                             Tips for installation                                     Tips for installation                                   Tips for installation

These cards are easily plugged into the US Boiler OCP panel and will improve system efficiency and easily meet some state required Low Water Cut Offs code requirements.

When installing the ES2, Series 3, ESC gas boilers or MPO-IQ oil boilers in commercial installations CSD-1 controls are required. CSD-1 requirements must include manual reset low water cut-off and manual reset external high limit controls. These two controls are sold as automatic reset or as manual reset and are CSD-1 certified.

In case of a card failure the cards are very easily bypassed. Follow the three easy steps.

         1. Remove the card from the OCP panel

             2. Press & release the "I" button on the OCP panel until the letters "LRN" appear

             3. Depress and hold either the up or down arrow buttons until the control clicks and OCP appears. This removes the card from memory and the IQ control operates as if the card was never installed.

      When the new card is installed the IQ control will automatically recognize the new card and install it. Any parameter changes you made to the old card must be re-entered. The parameters are stored in the cards and will not be updated to the new card.

MPO-IQ Oil Boiler Optional Wiring Diagrams

ES2, ESC and Series 3 Gas Boiler Optional Wiring Diagrams

 

Heat Loss Info    Tech Menu     Q&A Forum   Contact Us

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tips for Installation of  LWCO Module

1. Make sure the boiler has a good ground. The control works in conjunction with the ground.

2. Mount the probe in a 3/4" tee within 18" of the top of the boiler.

3. Do not use teflon tape on the probe threads.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tips for Installation of External High Limit Module

1. Only one here, set the module high limit setting 30f higher than the boiler high limit.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tips for Installation of ODR Module

1. The wire running between the OD sensor and the control should stay away from power sources and magnetic fields or use shielded cable.

2. I you have an indirect water heater make sure you turn on the priority protection which will bring the heat back on if it takes too long to make hot water.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Troubleshooting the Option Cards

Troubleshooting the option cards is a pretty simple process as they troubleshoot themselves. The cards will give you error codes as well as the OCP (Optional Control Panel). When there is an error on one of the option cards the OCP display will show an error. You will need to display the proper card by depressing the "I" button on the OCP to see the card error. Below is a chart which shows the error codes the panel will display. The first 3 codes have two digits. The first digit is the error code and the second digit is the card location.

 

Heat Loss Information     Tech Menu     Q&A Board